1. Hydraulics
Red pipe > Supply (25-35lpm)
Blue pipe > Return (Free flow return - Recommended)
2. Electrics
A. Connect 12V supply to 3pin plug
B. Connect wrapper harness to controller
ENTERING THE WORKING POSITION
1. Remove the transport pin from the load arm
2. Adjust the load arm width to suit the correct bale size.
3. Adjust the position of the dispenser to ensure that the film will be applied to the centre of the bale.
4. Add the film roll into the dispenser, ensuring that it is threaded correctly, and attach the film to the Cut & Start.